| |
Board of Directors
Shareholder
Services
Contact us
Back to Main Page |
 |
Facilities:
Water is derived from wells and is treated. 28 residences and the school are connected to a piped water and sewer system. 110 households now use a flush/haul system. 20 households use honeybuckets, and others have individual septic tanks. Construction of a new well, water treatment system, storage tank and washeteria are underway. Additional homes are being added to the piped water system. The City provides refuse collection and a landfill. The City began operating the landfill, located on the former Campion AFS grounds, in 1997. Improvements are needed.
Facilities:
Water is derived from wells and is treated. 28 residences and the school are connected to a piped water and sewer system. 110 households now use a flush/haul system. 20 households use honeybuckets, and others have individual septic tanks. Construction of a new well, water treatment system, storage tank and washeteria are underway. Additional homes are being added to the piped water system. The City provides refuse collection and a landfill. The City began operating the landfill, located on the former Campion AFS grounds, in 1997. Improvements are needed.
Facilities:
Water is derived from wells and is treated. 28 residences and the school are connected to a piped water and sewer system. 110 households now use a flush/haul system. 20 households use honeybuckets, and others have individual septic tanks. Construction of a new well, water treatment system, storage tank and washeteria are underway. Additional homes are being added to the piped water system. The City provides refuse collection and a landfill. The City began operating the landfill, located on the former Campion AFS grounds, in 1997. Improvements are needed.
|
Galena | Koyukuk | Nulato | Kaltag
Galena history
Facilites
|